Military Airlift: C-17 Aircraft Program


 

Publication Date: January 2007

Publisher: Library of Congress. Congressional Research Service

Author(s):

Research Area: Military and defense

Type:

Abstract:

The C-17 Globemaster III is a long-range cargo/transport aircraft operated by the U.S. Air Force since 1993. Congress approved development of the aircraft in the late 1970s, when it was recognized that the Air Force did not have enough airlift capability. In 1981, the McDonnell Douglas C-17 emerged as winner of a competition with Boeing and Lockheed to develop a next-generation aircraft to replace C-130s and C-141s.

Full-scale development of the C-17 got underway in 1986, but technical problems and funding shortfalls delayed the program, leading to slipped schedules and increased costs. Despite those difficulties, the C-17 has retained broad congressional support and enjoys strong Air Force and Army backing. Defense officials view the C-17 as essential because of its ability to fly long distances with large payloads yet still use smaller bases in remote areas.

The C-17 first flew in 1991, about a year later than originally scheduled. Deliveries began in 1993, and initial operational capability (IOC) was declared in June of that year. C-17s have been successfully employed in military operations in Bosnia, Kosovo, Afghanistan, Iraq, and also in support of several humanitarian/ disaster relief operations.

Production problems in the late 1980s raised questions about the possibility of more cost-effective alternatives. In April 1990, Defense Secretary Cheney reduced the projected buy from 210 to 120 planes. In late 1993, the Department of Defense (DOD) gave the contractor two years to solve production problems or face termination of the contract, with airlift shortfalls to be filled by modified commercial transport planes or existing military airlifters.

By the mid-1990s, the program's difficulties had been largely resolved, although some questioned the number of C-17s to be procured. In 1996 DOD approved plans to order 80 more C-17s for a total of 120 aircraft -- increased in late 1998 to 134. In June 2001, DOD announced its decision to acquire 137 C-17s, which would bring the Air Force's million-ton-miles-per-day capability to 45.3. Through FY2006, $54.5 billion has been provided for the C-17 program, and it is expected to cost an additional $5 billion to complete the program, as estimated in December 2005.

DOD planned to end C-17 production at 180 aircraft in FY2007, but both authorizers and appropriators voiced concern over that plan. Appropriators provided $2 billion in un-requested funding to purchase 10 additional C-17 aircraft and directed DOD to fund the program in FY2008.

The C-17 program is at the center of a number of airlift debates that confront policymakers. These issues include, but may not be limited to airlift needs and requirements, cost and budget, and industrial base issues.